NASA Building Giant Artemis 2 Moon Rocket Ahead of 2024 Launch

Rate this post

NASA is working on an exciting project – the Artemis 2 mission, set to launch in late 2024. This mission will take four astronauts around the moon, marking the first lunar liftoff with humans onboard in 52 years.

NASA Building Giant Artemis 2 Moon Rocket Ahead of 2024 Launch

Building the Giant Rocket

  • NASA is constructing a giant rocket known as the Space Launch System (SLS) at various centers across the southern United States.
  • The Artemis 2 mission involves the Orion capsule and the SLS rocket.

✅ Read Also: World’s First Liquid Oxygen-methane Powered Launch Vehicle “Zhuque-2 Y-3” Launched by China

Processing Solid Rocket Boosters at Kennedy Space Center (KSC)

  • At NASA’s Kennedy Space Center in Florida, parts of the two solid rocket boosters attached to the SLS core stage are being processed. These boosters are a crucial component for the launch.

Assembling the SLS Rocket

  • Engineers at KSC processed the right forward center segment of the SLS in late November.
  • Each segment is meticulously inspected, lifted into a vertical position, and prepared for integration and launch.
  • Once approved, the segments will be moved to the Vehicle Assembly Building for the final assembly of the massive rocket.

Supporting the Artemis 2 Orion Spacecraft

  • At NASA’s Marshall Space Flight Center in Alabama, a key piece supporting the Artemis 2 Orion spacecraft is being prepared.
  • This involves rotating the stage adapter, which connects Orion to the SLS upper stage.
  • The adapter also carries the autographs of the four crew members, adding a personal touch to the mission.

✅ Read Also: ISRO’s Gaganyaan Mission: Complete Details

Recent Milestones

  • The Orion spacecraft completed its first power-on test at KSC, while the SLS core stage now has all four engines installed.
  • The mobile launcher is undergoing rigorous testing, including water deluge tests, crucial for protecting the structure during launch.

Artemis 2 Crew Training

  • While the hardware is taking shape, the Artemis 2 crew is deep into their 18 months of training.
  • They are formulating procedures for the mission and paving the way for future Artemis program missions.

Looking Ahead to Artemis 3

  • Artemis 3, the next mission, is officially scheduled for 2025 or 2026 but may extend to 2027, according to a recent Government Accountability Office (GAO) report.
  • NASA is awaiting key landing elements, including SpaceX’s Starship vehicle and lunar surface spacesuits.

✅ Read Also: All About Aditya-L1 Mission: Date, Budget, Objectives, Payloads & More

The Artemis program marks a significant leap forward in space exploration, with each milestone bringing us closer to the next human lunar mission.

More Science and Tech Current Affairs:

Share This:

As a professional blogger and passionate educator, I am driven by a deep-seated desire to share knowledge and empower others. With years of experience in the field, I am committed to providing valuable insights and guidance to aspiring learners. My passion lies in helping individuals discover their potential and achieve their goals. I am also a firm believer in the power of motivation and strive to inspire others to pursue their dreams with unwavering determination.

Leave a Comment