NASA Building Giant Artemis 2 Moon Rocket Ahead of 2024 Launch

Rate this post

NASA is working on an exciting project – the Artemis 2 mission, set to launch in late 2024. This mission will take four astronauts around the moon, marking the first lunar liftoff with humans onboard in 52 years.

NASA Building Giant Artemis 2 Moon Rocket Ahead of 2024 Launch

Building the Giant Rocket

  • NASA is constructing a giant rocket known as the Space Launch System (SLS) at various centers across the southern United States.
  • The Artemis 2 mission involves the Orion capsule and the SLS rocket.

✅ Read Also: World’s First Liquid Oxygen-methane Powered Launch Vehicle “Zhuque-2 Y-3” Launched by China

Processing Solid Rocket Boosters at Kennedy Space Center (KSC)

  • At NASA’s Kennedy Space Center in Florida, parts of the two solid rocket boosters attached to the SLS core stage are being processed. These boosters are a crucial component for the launch.

Assembling the SLS Rocket

  • Engineers at KSC processed the right forward center segment of the SLS in late November.
  • Each segment is meticulously inspected, lifted into a vertical position, and prepared for integration and launch.
  • Once approved, the segments will be moved to the Vehicle Assembly Building for the final assembly of the massive rocket.

Supporting the Artemis 2 Orion Spacecraft

  • At NASA’s Marshall Space Flight Center in Alabama, a key piece supporting the Artemis 2 Orion spacecraft is being prepared.
  • This involves rotating the stage adapter, which connects Orion to the SLS upper stage.
  • The adapter also carries the autographs of the four crew members, adding a personal touch to the mission.

✅ Read Also: ISRO’s Gaganyaan Mission: Complete Details

Recent Milestones

  • The Orion spacecraft completed its first power-on test at KSC, while the SLS core stage now has all four engines installed.
  • The mobile launcher is undergoing rigorous testing, including water deluge tests, crucial for protecting the structure during launch.

Artemis 2 Crew Training

  • While the hardware is taking shape, the Artemis 2 crew is deep into their 18 months of training.
  • They are formulating procedures for the mission and paving the way for future Artemis program missions.

Looking Ahead to Artemis 3

  • Artemis 3, the next mission, is officially scheduled for 2025 or 2026 but may extend to 2027, according to a recent Government Accountability Office (GAO) report.
  • NASA is awaiting key landing elements, including SpaceX’s Starship vehicle and lunar surface spacesuits.

✅ Read Also: All About Aditya-L1 Mission: Date, Budget, Objectives, Payloads & More

The Artemis program marks a significant leap forward in space exploration, with each milestone bringing us closer to the next human lunar mission.

More Science and Tech Current Affairs:

Share This:

As a professional blogger and passionate educator, I am driven by a deep-seated desire to share knowledge and empower others. With years of experience in the field, I am committed to providing valuable insights and guidance to aspiring learners. My passion lies in helping individuals discover their potential and achieve their goals. I am also a firm believer in the power of motivation and strive to inspire others to pursue their dreams with unwavering determination.

Leave a Comment

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO